Monday, November 23, 2009
Continued Manufacturing of MCM
For the past week we have been working on the manufacturing of our Most Critical Module. Dylan ordered an 1"x1"x12" square aluminum stock and a 1" diameter by 12" length aluminum cylinder so that we could manufacture our wedge and our spool for the arm winch. Friday afternoon we finished making the upper arm and press fit in the rack, the lower arm, and the axle for the winch. On Monday (11/23, we plan to manufacture the wedge. There will be an update soon with pictures.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment